{"id":72521,"date":"2022-03-08T00:00:00","date_gmt":"2022-03-07T23:00:00","guid":{"rendered":"https:\/\/idec-hautestechnologies.com\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/"},"modified":"2023-03-25T11:49:49","modified_gmt":"2023-03-25T10:49:49","slug":"la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier","status":"publish","type":"post","link":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/","title":{"rendered":"Aledia\u2019s new production plant: Pictures of the progress of the worksite."},"content":{"rendered":"\n

The ER2i team gives us an update on the progress of the site, structural steelwork, envelope and process.<\/h2>\n\n\n\n
<\/div>
\n
<\/div>\n
\"\"<\/figure>\n<\/div>\n\n\n\n
<\/div>\n

End of the structural steelwork.\u00a0The Process building is constructed with a steel frame consisting of WPG (welded plate girders) columns, WPG truss rafters (first storey) and lattice trusses (roof).<\/p>\n<\/div>\n<\/div><\/section>\n\n\n\n

<\/div>
\n
<\/div>\n

Verification of structural bolts.\u00a0Structural steel connections are primarily made with non-pre-stressed bolts.\u00a0The manufacture and erection of the WPG columns with a height of more than 15 m were subject to reinforced traceability and inspection procedures (execution class EXC3).<\/p>\n<\/div>\n\n\n\n

<\/div>\n
\"\"<\/figure>\n<\/div>\n<\/div><\/section>\n\n\n\n
<\/div>
\n
<\/div>\n
\"\"<\/figure>\n<\/div>\n\n\n\n
<\/div>\n

Progress of the roofing and start of the cladding.\u00a0The metal structure of the Process building is transversely braced by steel portal frames, and longitudinally braced by sway frames on the fa\u00e7ade.
\u00a0Roof bracing and the concrete floor slab provide the diaphragmatic effect and the transfer of horizontal wind and earthquake forces to the portal frames and sway frames.<\/p>\n<\/div>\n<\/div><\/section>\n\n\n\n

<\/div>
\n
<\/div>\n

Cladding with 10 ml sandwich panels.
\u00a0The fa\u00e7ades are constructed of sandwich panels with a rock wool core, providing both the necessary thermal resistance and fire protection.<\/p>\n<\/div>\n\n\n\n

<\/div>\n
\"\"<\/figure>\n<\/div>\n<\/div><\/section>\n\n\n\n
<\/div>
\n
<\/div>\n
\"\"<\/figure>\n<\/div>\n\n\n\n
<\/div>\n

Casting of the composite floors.
\u00a0The floor joists are connected to the composite concrete slab with dowels to create composite floors and thus optimize the height of the steel beams.<\/p>\n<\/div>\n<\/div><\/section>\n\n\n\n

<\/div>
\n
<\/div>\n

Cladding completed.
\u00a0The roofing of the Process building is made from steel decking with insulation and self-protected two-layer bituminous waterproofing.<\/p>\n<\/div>\n\n\n\n

<\/div>\n
\"\"<\/figure>\n<\/div>\n<\/div><\/section>\n\n\n\n
<\/div>
\n
<\/div>\n
\"\"<\/figure>\n<\/div>\n\n\n\n
<\/div>\n

Installation of the ducts, sprinklers and cable trays for the future clean room.
\u00a0The structural steelwork has been designed to withstand the heavy loads of suspended networks under the floors.<\/p>\n<\/div>\n<\/div><\/section>\n","protected":false},"excerpt":{"rendered":"

Retour en image sur l’avancement du chantier de la nouvelle zone de production de l’entreprise Aledia dans la ZAC Saut du Moine \u00e0 Champagnier (Is\u00e8re 38). Cette nouvelle unit\u00e9 permettra la production en grande s\u00e9rie de microleds 3D pour les \u00e9crans nouvelle g\u00e9n\u00e9ration.<\/p>\n","protected":false},"author":1,"featured_media":70819,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[54],"tags":[],"class_list":["post-72521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"yoast_head":"\nAvancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES<\/title>\n<meta name=\"description\" content=\"Aledia\u2019s new production plant: Pictures of the progress of the worksite.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Avancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES\" \/>\n<meta property=\"og:description\" content=\"Aledia\u2019s new production plant: Pictures of the progress of the worksite.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\" \/>\n<meta property=\"og:site_name\" content=\"IDEC HAUTES TECHNOLOGIES\" \/>\n<meta property=\"article:published_time\" content=\"2022-03-07T23:00:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-03-25T10:49:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"918\" \/>\n\t<meta property=\"og:image:height\" content=\"612\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"J-Michel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"J-Michel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\"},\"author\":{\"name\":\"J-Michel\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128\"},\"headline\":\"Aledia\u2019s new production plant: Pictures of the progress of the worksite.\",\"datePublished\":\"2022-03-07T23:00:00+00:00\",\"dateModified\":\"2023-03-25T10:49:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\"},\"wordCount\":267,\"publisher\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\",\"url\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\",\"name\":\"Avancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES\",\"isPartOf\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg\",\"datePublished\":\"2022-03-07T23:00:00+00:00\",\"dateModified\":\"2023-03-25T10:49:49+00:00\",\"description\":\"Aledia\u2019s new production plant: Pictures of the progress of the worksite.\",\"breadcrumb\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage\",\"url\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg\",\"contentUrl\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg\",\"width\":918,\"height\":612},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/idec-hautestechnologies.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Aledia\u2019s new production plant: Pictures of the progress of the worksite.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#website\",\"url\":\"https:\/\/idec-hautestechnologies.com\/\",\"name\":\"IDEC HAUTES TECHNOLOGIES\",\"description\":\"Le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main de site industriels d\u00e9di\u00e9s aux \u00e9nergies et micro\u00e9lectronique, sciences de la vie, laboratoires de recherche, hospitalier et plateaux techniques\",\"publisher\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/idec-hautestechnologies.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#organization\",\"name\":\"IDEC HAUTES TECHNOLOGIES\",\"url\":\"https:\/\/idec-hautestechnologies.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/03\/logo-idec-hautes-technologies-130x155-blc-fond-vert.png\",\"contentUrl\":\"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/03\/logo-idec-hautes-technologies-130x155-blc-fond-vert.png\",\"width\":130,\"height\":155,\"caption\":\"IDEC HAUTES TECHNOLOGIES\"},\"image\":{\"@id\":\"https:\/\/idec-hautestechnologies.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/idec-hautestechnologies\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128\",\"name\":\"J-Michel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g\",\"caption\":\"J-Michel\"},\"sameAs\":[\"https:\/\/idec-grandsud.com\/idec-sante\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Avancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES","description":"Aledia\u2019s new production plant: Pictures of the progress of the worksite.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/","og_locale":"en_US","og_type":"article","og_title":"Avancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES","og_description":"Aledia\u2019s new production plant: Pictures of the progress of the worksite.","og_url":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/","og_site_name":"IDEC HAUTES TECHNOLOGIES","article_published_time":"2022-03-07T23:00:00+00:00","article_modified_time":"2023-03-25T10:49:49+00:00","og_image":[{"width":918,"height":612,"url":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg","type":"image\/jpeg"}],"author":"J-Michel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"J-Michel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#article","isPartOf":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/"},"author":{"name":"J-Michel","@id":"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128"},"headline":"Aledia\u2019s new production plant: Pictures of the progress of the worksite.","datePublished":"2022-03-07T23:00:00+00:00","dateModified":"2023-03-25T10:49:49+00:00","mainEntityOfPage":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/"},"wordCount":267,"publisher":{"@id":"https:\/\/idec-hautestechnologies.com\/#organization"},"image":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/","url":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/","name":"Avancement du chantier usine d'Aledia. - IDEC HAUTES TECHNOLOGIES","isPartOf":{"@id":"https:\/\/idec-hautestechnologies.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage"},"image":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage"},"thumbnailUrl":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg","datePublished":"2022-03-07T23:00:00+00:00","dateModified":"2023-03-25T10:49:49+00:00","description":"Aledia\u2019s new production plant: Pictures of the progress of the worksite.","breadcrumb":{"@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#primaryimage","url":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg","contentUrl":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg","width":918,"height":612},{"@type":"BreadcrumbList","@id":"https:\/\/idec-hautestechnologies.com\/en\/la-nouvelle-usine-de-production-daledia-retour-en-image-sur-lavancement-du-chantier\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/idec-hautestechnologies.com\/en\/"},{"@type":"ListItem","position":2,"name":"Aledia\u2019s new production plant: Pictures of the progress of the worksite."}]},{"@type":"WebSite","@id":"https:\/\/idec-hautestechnologies.com\/#website","url":"https:\/\/idec-hautestechnologies.com\/","name":"IDEC HAUTES TECHNOLOGIES","description":"Le sp\u00e9cialiste de la conception et de la construction cl\u00e9 en main de site industriels d\u00e9di\u00e9s aux \u00e9nergies et micro\u00e9lectronique, sciences de la vie, laboratoires de recherche, hospitalier et plateaux techniques","publisher":{"@id":"https:\/\/idec-hautestechnologies.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/idec-hautestechnologies.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/idec-hautestechnologies.com\/#organization","name":"IDEC HAUTES TECHNOLOGIES","url":"https:\/\/idec-hautestechnologies.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-hautestechnologies.com\/#\/schema\/logo\/image\/","url":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/03\/logo-idec-hautes-technologies-130x155-blc-fond-vert.png","contentUrl":"https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/03\/logo-idec-hautes-technologies-130x155-blc-fond-vert.png","width":130,"height":155,"caption":"IDEC HAUTES TECHNOLOGIES"},"image":{"@id":"https:\/\/idec-hautestechnologies.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/idec-hautestechnologies\/"]},{"@type":"Person","@id":"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/dca0493d0321d6cad9e82d4f045d9128","name":"J-Michel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/idec-hautestechnologies.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/5bc14a2950ec39bfcae4ff63e02b3aad?s=96&d=mm&r=g","caption":"J-Michel"},"sameAs":["https:\/\/idec-grandsud.com\/idec-sante\/"]}]}},"uagb_featured_image_src":{"full":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"thumbnail":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-150x150.jpg",150,150,true],"medium":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-300x200.jpg",300,200,true],"medium_large":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-768x512.jpg",768,512,true],"large":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"1536x1536":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"2048x2048":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"post-thumbnail":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-370x247.jpg",370,247,true],"qwery-thumb-huge":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"qwery-thumb-big":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-840x473.jpg",840,473,true],"qwery-thumb-med":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-410x230.jpg",410,230,true],"qwery-thumb-tiny":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-120x120.jpg",120,120,true],"qwery-thumb-masonry-big":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-840x560.jpg",840,560,true],"qwery-thumb-masonry":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-410x273.jpg",410,273,true],"qwery-thumb-rectangle":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-570x612.jpg",570,612,true],"qwery-thumb-medium-square":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-650x572.jpg",650,572,true],"qwery-thumb-square":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-890x612.jpg",890,612,true],"qi_addons_for_elementor_image_size_square":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-650x612.jpg",650,612,true],"qi_addons_for_elementor_image_size_landscape":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"qi_addons_for_elementor_image_size_portrait":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-650x612.jpg",650,612,true],"qi_addons_for_elementor_image_size_huge-square":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001.jpg",918,612,false],"trx_addons-thumb-small":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-270x152.jpg",270,152,true],"trx_addons-thumb-portrait":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-370x493.jpg",370,493,true],"trx_addons-thumb-avatar":["https:\/\/idec-hautestechnologies.com\/wp-content\/uploads\/sites\/4\/2022\/09\/ER2i_Aledia_E04_001-370x370.jpg",370,370,true]},"uagb_author_info":{"display_name":"J-Michel","author_link":"https:\/\/idec-hautestechnologies.com\/en\/"},"uagb_comment_info":0,"uagb_excerpt":"Retour en image sur l'avancement du chantier de la nouvelle zone de production de l'entreprise Aledia dans la ZAC Saut du Moine \u00e0 Champagnier (Is\u00e8re 38). Cette nouvelle unit\u00e9 permettra la production en grande s\u00e9rie de microleds 3D pour les \u00e9crans nouvelle g\u00e9n\u00e9ration.","_links":{"self":[{"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/posts\/72521"}],"collection":[{"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/comments?post=72521"}],"version-history":[{"count":0,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/posts\/72521\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/media\/70819"}],"wp:attachment":[{"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/media?parent=72521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/categories?post=72521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/idec-hautestechnologies.com\/en\/wp-json\/wp\/v2\/tags?post=72521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}